Service
Installation
After-sales Service
Maintenance
Video of Installation
        Service


Installation After-sales Service Maintenance Video of Installation
Installation
Part l. Tools introduction
Design drawings,Marking gauge,Elastic string,Nails,Bi-color pencil,Hammer,Knife,Floor brush,Doctor blade and Tape measure.
Shovels--the shovels are used for filling in the quartz sands and rubber granules.
Manual cart--the manual cart is used for carrying the sands and rubber granules.
 
Part ll. Preparations for installation
No.1 Recheck the dimension of the court and make sure it is accordant with the drawing.Check the base and make sure it's qualified.
 
No.2 Clean the court surface and close it.If possible,keep out irrelevant people during installation.
 
No.3 Check and make sure of the quantity of grass rolls,check if the roll size and the roll numbers are conformed to the drawings.
 
No.4 Make sure that the accessories (glue,joining tape,tools,etc.) are qualified for the installation.
 
No.5 Make sure that the sand and rubber granules are qualified for the installation. Especially that the sands must be dry. Wet sands are NOT allowed.
 
Part lll. Installation process
Step 1. Make lines on the base
Tools: the drawing,marking gauge, bi-color pencil, tape measure, nails,hammer and elastic string.
 
Step 2. Grass preparation
Tools: the drawings
 
Step 3. Lay out the grass rolls and cut the edges
Tool: the knife
 
Step 4. Join the edges
Tools: the knife and doctor blade
 
Step 5. Cut out the game lines
Tool: the knife
 
Step 6. Paste white lines into the carpet
Tool: the knife
 
Step 7. Fill in quartz sands
Tools: the shovels and manual cart (If possible,use a tractor or sand-filling machines for this step.)
 
Step 8. Fill in rubber granules
Tools: shovel and manual cart (If possible,use a tractor or sand-filling machines for this step.)
 
The installation method is for your reference only!